WHAT WE DID Installation of SMS polyrend system to pile walls to allow for tanking membrane install an a smooth surface.
Author Archives: admin
WHAT WE DID Popular events venue constructing an underground micro-brewery, SMS installed Sikalastic 8800 to the podium deck.
WHAT WE DID SMS have worked with NU-living to spray the roofs of prefab timber houses in the factory they are constructed, they are then taken to site and fixed to the foundations.
WHAT WE DID SMS have waterproofed the roofs and podiums of the new Nine Elms Tube station using Sikalastic membrane.